Project Description:

The Hilton Garden Inn (“HGI”) had rock and existing concrete foundations from the previous building’s structure. With HGI having 2-Stories of below-grade structure as well, Rinaldi had to perform rock& concrete excavation & breaking.

Rinaldi utilized Line-Drilling to minimize vibration as a part of the firm’s vibration & crack protection and monitoring processes. As part of the SOE given the 2-Stories of below-grade Cellar and Sub- Cellar structure, Rinaldi had to drive Steel H- Piles or Soldier Piles and install Timber Lagging along South (Street) Elevation.

Location:

45 East 33rd Street
New York, NY

Project Details:

VALUE:
$36,965,000

SIZE:
New: 24-Stories
232-Guestrooms
118,000 SF

ARCHITECT:
Ismael Leyva Architects

STRUCTURAL ENGINEER:
Ysrael Seinuk, PC

MEPS ENGINEER:
Ettinger & Associates

GEOTECHNICAL ENGINEER:
RA Consultants, LLC

PROGRESS:

Progress 100