Page 75 - TRG AIA-305 Prequalification Statement
P. 75

3.5 PROJECT EXPERIENCE - Major Projects Completed in the Past 5-10 Years
 From AIA Form A305 - Contractor's Qualification Statement



 NAME OF OWNER  PROJECT NAME  CHECK  LIST NAME & TELEPHONE   CONTRACT  APPROX.  PERCENT  COMMENTS
 OWNER ADDRESS, TELEPHONE AND  PROJECT LOCATION  GC or CM  ARCHITECT AND/OR ENGINEER  VALUE  DATE COMPL.  COMPLETE  OTHER NOTES
 CONTACT NAME  PROJECT DESCRIPTION  GC  CM      MO.         YR.      TO DATE          (if applicable)
 New Meadowlands Stadium  A  demonstration  of  TRG's  versatility  is  the  X   Metromedia Technologies   $ 350,620.00  8  2014  100%  $ 350,620.00
 performance  of  this  high-profile  project  in  the
 Metromedia Technologies 10 E. 34th   10 E. 34th Street, 9th Floor                 Total Completed & Stored
 Street, 9th Floor   Meadowlands,  New  Jersey,  at  the  New
 New York, NY 10016  Meadowlands  Stadium.    TRG  had  to  FAST-  New York, NY 10016             to date
 TRACK  its  performance,  under  UNION  labor,
 Mike Kakoyiannis, President  installing structural steel infrastructure, electrical  Mike Kakoyiannis, President  $ 0.00
 212-273-2111  service  &  protection  for  four  (4)  new  high-end  212-273-2111     Balance to Complete
 advertisement signs at the four (4) cornerstones
 of the Stadium.
 st
 257 Grace Avenue  In its 1  residential development property, TRG  X   Design Group Architectura  $ 2,095,000.00  6  2010  100%  $ 2,095,000.00
 The Rinaldi Group LLC One Harmon   self-performed  all  aspect  of  this  development  935 River Road   Total Completed & Stored
 Meadow Blvd.  from the purchase of the property and demolition
 Secaucus, NJ 07094  of  the  exiting  home  to  the  A/E  design  and  Edgewater, NJ 07094       to date
 construction  of  the  new  6,160  sf  luxury
 estate.  Construction included radiant floor heat,   Conrad Roncati, RA                           $ 0.00
 three (3)  Napoleon  Fireplace,  two  (2)  full
 --  201-886-1400                                                                      Balance to Complete
 kitchens,  six  (6)  full  baths;  reverse  osmosis
 water purification systems; Lutron A/V System; &
 Viking/Mele Appliances.




 396 Broadway  Renovation,  restoration  and  conversion  of  X  DXA Studio  $ 25,273,299.00  7  2019  100%  $ 25,273,299.00
 existing  10-Story  Landmark  structure  into  a
 396 Broadway 220 5th Avenue - 19th   luxury  boutique  hotel,  complete  with  171-  894 6th Avenue, 5th Floor   Total Completed & Stored
 Floor  Guestrooms,  a  restaurant,  bar  and  lounge  and
 New York, NY 10001  commercial space, totaling 63,658 SF located in  New York, NY 10001          to date
 the  TriBeCa/SOHO  neighborhood  of  Lower  Jordan Ragove, RA                                     $ 0.00
 Manhattan.
 --  212-874-0567                                                                      Balance to Complete
 The Residence at Ritz Carlton    Together  with  and  as  a  General  Contractor  to  X  Costas Kondylis Design, LLC   $ 500,000,000.00  12  2007  100%  $ 500,000,000.00
 the  Construction  Manager,  GAFCO,  TRG  built
 Renaissance Square 221 Main Street  31 West 27th Street 8th Floor                 Total Completed & Stored
 these (2) 47-Story Residential Towers connected
 White Plains, NY   to  the  10-Story  Ritz  Carlton  Hotel.   Project  New York, NY              to date

 Cappelli Enterprises, Inc.  included  360-Residential  Units  and  155-Hotel  Costas Kondylis     $ 0.00
 Guestrooms  with  3-Restaurants  encompassing
 --  1.2-MM  SF  total  core-and-shell  construction,  --                              Balance to Complete
 800,000 SF of sellable space and a 5-Story below
 grade parking garage.


 Trump Tower, New Rochelle    Together  with  and  as  a  General  Contractor  to  X  Lessard Design Inc.   $ 175,000,000.00  10  2007  100%  $ 175,000,000.00
 the  Construction  GAFCO,  TRG    built  this  40-
 175 Huguenot Street   8521 Lessburg Pike Suite 700                                Total Completed & Stored
 Story    Mixed-Use  Residential  Tower,  consisting
 New Rochelle, NY   of  30-Stories,  187-  Residential  Units  comprising  Vienna, VA             to date
 353,000 SF residential construction and 138,000
 Cappelli Enterprises, Inc.                                                                        $ 0.00
 SF, including a New York Sports Club.
 --  --                                                                                Balance to Complete