Page 75 - TRG AIA-305 Prequalification Statement
P. 75
3.5 PROJECT EXPERIENCE - Major Projects Completed in the Past 5-10 Years
From AIA Form A305 - Contractor's Qualification Statement
NAME OF OWNER PROJECT NAME CHECK LIST NAME & TELEPHONE CONTRACT APPROX. PERCENT COMMENTS
OWNER ADDRESS, TELEPHONE AND PROJECT LOCATION GC or CM ARCHITECT AND/OR ENGINEER VALUE DATE COMPL. COMPLETE OTHER NOTES
CONTACT NAME PROJECT DESCRIPTION GC CM MO. YR. TO DATE (if applicable)
New Meadowlands Stadium A demonstration of TRG's versatility is the X Metromedia Technologies $ 350,620.00 8 2014 100% $ 350,620.00
performance of this high-profile project in the
Metromedia Technologies 10 E. 34th 10 E. 34th Street, 9th Floor Total Completed & Stored
Street, 9th Floor Meadowlands, New Jersey, at the New
New York, NY 10016 Meadowlands Stadium. TRG had to FAST- New York, NY 10016 to date
TRACK its performance, under UNION labor,
Mike Kakoyiannis, President installing structural steel infrastructure, electrical Mike Kakoyiannis, President $ 0.00
212-273-2111 service & protection for four (4) new high-end 212-273-2111 Balance to Complete
advertisement signs at the four (4) cornerstones
of the Stadium.
st
257 Grace Avenue In its 1 residential development property, TRG X Design Group Architectura $ 2,095,000.00 6 2010 100% $ 2,095,000.00
The Rinaldi Group LLC One Harmon self-performed all aspect of this development 935 River Road Total Completed & Stored
Meadow Blvd. from the purchase of the property and demolition
Secaucus, NJ 07094 of the exiting home to the A/E design and Edgewater, NJ 07094 to date
construction of the new 6,160 sf luxury
estate. Construction included radiant floor heat, Conrad Roncati, RA $ 0.00
three (3) Napoleon Fireplace, two (2) full
-- 201-886-1400 Balance to Complete
kitchens, six (6) full baths; reverse osmosis
water purification systems; Lutron A/V System; &
Viking/Mele Appliances.
396 Broadway Renovation, restoration and conversion of X DXA Studio $ 25,273,299.00 7 2019 100% $ 25,273,299.00
existing 10-Story Landmark structure into a
396 Broadway 220 5th Avenue - 19th luxury boutique hotel, complete with 171- 894 6th Avenue, 5th Floor Total Completed & Stored
Floor Guestrooms, a restaurant, bar and lounge and
New York, NY 10001 commercial space, totaling 63,658 SF located in New York, NY 10001 to date
the TriBeCa/SOHO neighborhood of Lower Jordan Ragove, RA $ 0.00
Manhattan.
-- 212-874-0567 Balance to Complete
The Residence at Ritz Carlton Together with and as a General Contractor to X Costas Kondylis Design, LLC $ 500,000,000.00 12 2007 100% $ 500,000,000.00
the Construction Manager, GAFCO, TRG built
Renaissance Square 221 Main Street 31 West 27th Street 8th Floor Total Completed & Stored
these (2) 47-Story Residential Towers connected
White Plains, NY to the 10-Story Ritz Carlton Hotel. Project New York, NY to date
Cappelli Enterprises, Inc. included 360-Residential Units and 155-Hotel Costas Kondylis $ 0.00
Guestrooms with 3-Restaurants encompassing
-- 1.2-MM SF total core-and-shell construction, -- Balance to Complete
800,000 SF of sellable space and a 5-Story below
grade parking garage.
Trump Tower, New Rochelle Together with and as a General Contractor to X Lessard Design Inc. $ 175,000,000.00 10 2007 100% $ 175,000,000.00
the Construction GAFCO, TRG built this 40-
175 Huguenot Street 8521 Lessburg Pike Suite 700 Total Completed & Stored
Story Mixed-Use Residential Tower, consisting
New Rochelle, NY of 30-Stories, 187- Residential Units comprising Vienna, VA to date
353,000 SF residential construction and 138,000
Cappelli Enterprises, Inc. $ 0.00
SF, including a New York Sports Club.
-- -- Balance to Complete