myrtle avenue Development is located in Downtown Brooklyn. it consists of 2-major phases with the 1st Phase rolled-out over three (3) sub-phases
consisting of Buildings a/B, B/c and D. the overall development consists of 515 rental Units, which include 95-Units of affordable Housing under Building
D, 218 myrtle avenue and 420-Units of market-rate rentals across Buildings a/B & B/c, in addition to underground Parking and street level commercial
and retail space. Phased into 4-separate and distinct buildings, Building D under Phase i, at the corner of ashland Place & myrtle avenue, is the first
building completed in this overall $254-mm project, with the 12-Story Building Bc to follow next; the 15- Story Building a to follow thereafter; and the
40-Story luxury high-rise condominium tower to finish, estimated for ground-breaking april 2012. achieving Substantial completion in nov. 2009, this
project was completed on-time and under budget. in fact, the owner used it’s portion of Shared-Savings under the cm-GmP to Upgrade finishes throughout
the building, including within the 95-individual apartments as well as within the lobby and elevator lobbies. ValUe - Phase 1 Building D: 9-Stories w/
cellar, 95-Units, 110,000 SF $22,096,362 Building B/c: 15-Stories w/ cellar / 215-Units / 240,000 SF / $47,609,303 Building a/B: 15-Stories w/ Sub-
Cellar / 205-Units / 265,271 SF/$55,761,930 VALUE - Phase 240-Story Tower / 305-Units / 340,000 SF / $67,447,000 ∙ ARCHITECT Dattner Architects ∙
STRUCTURAL ENGINEER Goldstein Associates ∙ MEPS ENGINEER Ettinger Engineering ∙ CIVIL ENGINEER Langan Engineering ∙ DEVELOPER Red Apple
109 Gold street - Brooklyn, nY.
7-Story luxury condominium located in Downtown Brooklyn’s DUmBo Section with Block-&-Plank Superstructure, 1-Story below grade cellar and onsite
Parking with automatic Security metal roll-up Garage door entrance. construction features include a combination of exterior Façade trespa metal Panels
with built-in rain curtain and YKK Window-wall & Punched Windows, aluminum & Glass Balcony rails and a 7th Floor Penthouse with a SF outdoor terrace.
interior Finishes consist of High-gloss White lacquer Kitchen cabinets & Vanities with Black onyx caesar-stone countertops, 1” thick & 6” wide Solid Plank
Wood Flooring by Danish’s Junckers manufacturer and luxury Kitchen Appliances by Viking, Bosch & Liebherr. VALUE $7,394,302 ∙ SIZE 7 - Stories plus
basement 33 - Condo Units 34,000 GSF ∙ ARCHITECT Kutnicki Bernstein Associates ∙ STRUCTURAL ENGINEER MC Structural Engineering ∙ MEPS ENGINEER
Sideris Engineers ∙ OWNER/DEVELOPER Gold & York Development
assistant Project Manager
George a. Fuller company, Inc., (GaFco) – Val Halla, nY
the residence at ritz carlton, renaissance square – 221 Main street, White Plains, nY.
Under a design-build, GaFco built the tallest and largest high-rise building(s) in Westchester together with the world-renown architectural firm costas
Kondylis and their assistants Harvey Kaufman, aia and Frank nicholson, aia, for cappelli enterprises, inc. this $500-m project consisted of two (2)
47-Story luxury condominium towers connected by a 10-Story ritz-carlton Hotel, comprising some 1.2-m SF of construction and more than 800,000 SF of
saleable space.
Given the rigors of building and designing while the project progressed, ms. Santos had to coordinate and prioritize her duties each and every day working
between and assisting the Sr. Project management team of engineers and architects for both tower a and the Hotel; the estimating and Purchasing
Department for subcontractor and vendor letting; Design, as cappelli enterprises provided it’s own Design team lead by chief Designer Kathleen Hennessy,
aia; and home-office accounting Department relative to accounts Payable, Subcontractor requisitioning and Payroll, since GaFco self-performed the trades
of concrete, carpentry, drywall and framing, mePS and stone installation.
Full-charge Bookkeeper/assistant Project Manager
crain construction company, Inc. – Hackensack, nJ
as a Full-charge Bookkeeper, ms. Santos was responsible for all aspects of bookkeeping and accounting functions such as, procurement, review and
execution of certified payroll reports between Gc (crain) and Subcontractor trades; internal payroll, taxes and insurance; monthly bank reconciliation
reports, affirmative action and eeo project manning reports; accounts receivable and accounts Payable; coordinating and integrating project cost controls
between estimating and project management; coordinating between project management and chief estimator, cFo, outside and independent cPa, bank and
surety in providing monthly statistical reports, WiP (Work-in-Progress) schedules and cash-flow charts.
as an assistant Project manager, ms. Santos was responsible for organizing and executing all bid documents and requirements for estimating department
during competitive public bidding process; administration of all insurance matters, including general liability, ocP, builders risk, and worker’s compensation,
as well as managing all renewals and audits; project management support on procurement of all submittals, rFi’s, Bulletins, Pco and co’s and noD’s; and
subcontractor and vendor rFP’s and monthly scheduling updates.
rInaLDInYc.coM