DaviD Saranow
Managing Director of operations
Yacht Harbour Condominium – Coconut Grove, FL
Senior Project Manager
interior renovation project of all common areas in a landmark 18-story, 140-unit oceanside condominium tower in coconut grove including ground
floor (carrera marble flooring, new millwork reception desk, library credenza, all lobby finishes, relocation of original engraved floor-to-ceiling wood art
panels, library / social room, valet booth, elevator lobby, management office and party room and mail room), all resident corridors (new unit entry doors,
refurbished existing HM frames, new wallpaper, carpet, ceilings, elevator vestibules, refinishing existing wood cornice), upgrade of building fire protection
including new sprinkler heads in all 140 units, repairs and upgrades to existing Mep systems. arcHitect: rD architects - Meps engineers: gonzalez
consulting engineers - interior Designer: studio five Design + associates.
UriBE ConSTrUCTion inC., Miami, Florida
Project Manager / Superintendent, Chief operations officer
The Clay Hotel, Miami Beach, FL
Project Manager / Superintendent
this project was a $10 million gut renovation of a landmark hotel in south Beach that included major structural improvements, complete demolition and
rebuild of all Meps, remodeling of all common areas and guest rooms and construction of a ground floor 5-star lobby and restaurant. a major challenge in
this project was the installation of a new elevator in the existing hotel lobby which required a major dewatering operation while excavating and pouring the
elevator pit, and structural connection of the elevator shaft to the upper guest floors. the project operated under a phased permit with evolving revisions
to the layout and design so responsibilities included continual communication and coordination with ownership, design team and subcontractors to track
project changes and provide feasibility and cost analysis feedback to owners on proposed changes. VaLUe: $10,500,000 – arcHitect: DnB Design group
- strUctUraL engineer: Desimone engineering - Meps engineers: JMM consulting engineers - ciViL engineer: florida civil.
Bal Harbour 101 Condominium Tower, Bal Harbour, FL
Project Manager / Superintendent
full gut and structural renovation project of all common areas in an iconic luxury 21-story condominium tower in Bal Harbour including entire ground floor
(exterior porte cochere, lobby, galleries, restaurant, pool deck, restrooms, elevator lobby and management offices), resident corridors (unit entry doors
/ frames, wallpaper, carpet, ceilings, elevator vestibules) state-of-the-art roof-top gymnasium (complete gut, structural improvements, Meps relocations
and full fit-out) and roof deck (structural repairs, replace topping slab, pt cable repair, pavers and glass railings). responsibilities included supervision of
teams of up to 40 construction professionals, collaboration with architect, engineers and sub-contractors to create shop drawings and delivered precise
site conditions to accept engineered materials, project scheduling, job costing, change order management, project documentation, log maintenance,
processing project requisitions and project close-out. VaLUe: $6,200,000 – arcHitect: Kobi Karp architecture - strUctUraL engineer: YHce - Meps
engineers: Ventrop engineering - ciViL engineer: ocean engineering.
1427 washington avenue retail Space, Miami Beach, FL
Project Manager / Superintendent
ground-up construction of a 6,000 sf retail commercial building in south Beach. the property has shared common cMU demising walls with both adjacent
properties and a historic façade that needed to be braced and preserved which created challenging logistical problems that required creative management
and out-of-the box solutions. scope of work included 50 auger cast and helical piles, two new 150 gpM restaurant-grade grease traps / interceptors and
new surface parking structure with mezzanine level offices and storage. project management responsibilities included subcontractor buy-outs, contract
negotiations, subcontractor coordination and project close-out. VaLUe: $3,800,000 – arcHitect: 3 Design architecture - strUctUraL engineer:
fernandez-Barquin engineering - Meps engineers: Megpe engineering - ciViL engineer – samabi group consulting engineers.
Mount Sinai Medical Center MSoP Facility renovation, Miami Beach, FL
Project Manager / Superintendent
full gut-renovation of 5,000 sf mental health facility in the Mount sinai Medical center in Miami Beach. this project was executed under the strict rules and
restraints of building in a working hospital setting. these constraints included after hours restrictions for all demolition, material loading and noise creating
activities. air scrubbers and controlled debris removal was required. all finishes were custom high-end products sourced for the specific requirements of a
mental health facility. Daily onsite project management and superintendent responsibilities included close monitoring of all trade contractors for complete
complieance with all hospital rules and continually communicating and coordinating with hospital staff.
VaLUe: $2,500,00 – arcHitect: Br3 architecture - Meps engineers: initial engineering.