3.5 PROJECT EXPERIENCE - Major Projects Completed in the Past 5-Years

 From AIA Form A305 - Contractor's Qualification Statement



 NAME OF OWNER  PROJECT NAME  CHECK  LIST NAME & TELEPHONE   CONTRACT  APPROX.  PERCENT  COMMENTS
 OWNER ADDRESS, TELEPHONE AND  PROJECT LOCATION  GC or CM  ARCHITECT AND/OR ENGINEER  VALUE  DATE COMPL.  COMPLETE  OTHER NOTES
 CONTACT NAME  PROJECT DESCRIPTION  GC  CM      MO.         YR.      TO DATE          (if applicable)
 220 Water Street, Brooklyn, NY  Conversion  of  5-Story  Landmark  warehouse  X     Perkins Eastman  $ 25,629,272.00  3  2012  100%  $ 25,629,272.00
 facility  in  DUMBO  Brooklyn.  Building  footprint
 GDC Properties, aka Ginsburg   was   40,000   SF   spanning   over   5-       422 Summer Street   Total Completed & Stored
 Development 245 Saw Mill River Road   floors totaling 200,000 SF.  Project includes 135-
 Hawthorne, NY 10532  Stamford, CT 10532                                                          to date
 Loft   type rental units with   2-Story   Grand
 Lobby w/a   120'-L   x   25'-W   skylight  Stuard Lachs, AIA, Principal                           $ 0.00
 overhead.    Project   was   named   by the
 --  Brooklyn Chamber, Project-of-the-Year  for Multi-  203-251-7437                   Balance to Complete
 Family Residential Development, 2011.



 Hilton Garden Inn  New  29-Story hotel  w/Cellar &  Sub-cellar for  X     Ismael Leyva Architects  $ 36,965,000.00  6  2015  100%  $ 36,965,000.00
 back-of-house, providing full-services including a
 NYC Hotel 33, LLC. 404 S. Figueroa St -   2,000 SF restaurant and bar just off the 1st Floor  48 W. 37th Street   Total Completed & Stored
 Suite 516  lobby  and  a  spectacular  2nd  Floor  terrace
 Los Angeles, CA 90071  New York, NY 90071                                                        to date
 bar/lounge serviced by  a 2-Story  glass elevator.
 Construction includes 1-Story below grade rock-  Manish Chadha, AIA                               $ 0.00
 excavation and a cast-in-place superstructure w/
 --  combination  aluminum  & metal  panel  window-  212-342-7822                      Balance to Complete
 wall facade. 232-Guestrooms over 118,000 SF.



 218 Myrtle Avenue  New  10-Story  Mixed-Use,  affordable  housing  X      Dattner Architects   $ 22,096,360.00  8  2010  100%  $ 22,096,360.00
 residential  building  consisting  of  core-and-shell
 218 Myrtle Avenue    130 W. 57th Street                                           Total Completed & Stored
 construction,   including cellar   and   1st
 Brooklyn, NY 11201  Floor commercial/retail  and  9-Stories  residential  New York, NY 11201     to date
 rental  units.   Construction  consists  of  Block-&-
 Art Sozemenu  Ira Mitchneck, AIA                                                                  $ 0.00
 Plank  shell with  structural  steel  cellar-thru-2nd
 732-832-9170  Floor;  exterior  block-&-brick  facade;  double-  212-247-2660         Balance to Complete
 hung,  aluminum  punch-windows;  & aluca  bond
 metal panels.  95-Units.  111,220 SF.



 New Meadowlands Stadium  A  demonstration  of  TRG's  versatility  is  the  X      Metromedia Technologies   $ 350,620.00  8  2014  100%  $ 350,620.00
 performance  of  this  high-profile  project  in  the
 Metromedia Technologies 10 E. 34th   10 E. 34th Street, 9th Floor                 Total Completed & Stored
 Street, 9th Floor   Meadowlands,  New  Jersey,  at  the  New
 New York, NY 10016  Meadowlands  Stadium.    TRG  had  to  FAST-  New York, NY 10016             to date
 TRACK  its  performance,  under  UNION  labor,
 Mike Kakoyiannis, President  installing structural steel infrastructure, electrical  Mike Kakoyiannis, President  $ 0.00
 212-273-2111  service  &  protection  for  four  (4)  new  high-end  212-273-2111     Balance to Complete
 advertisement signs at the four (4) cornerstones