Mike Ofili
PROJECT MANAGER
• Coordinated MEP exterior wall penetrations with skin activities
Grove Central Station Water Mains - Coconut Grove, Miami, fl
$6M, 42” double watermain relocation under city and federal roads
• Performed as project manager and superintendent from startup to completion
• Coordinated with local municipalities (including FDOT, Miami-Dade County, Miami-Dade Transit, City of Miami, and Miami-Dade Water & Sewer Department)
and police authorities for inspections & permits
• Managed all scheduling, cost items, document control, field supervision, and sub coordination
• Executed complex scope of work with underqualified subcontractor while overcoming unforeseen conditions underneath a residential roadway
Coco Walk Shopping Center - Coconut Grove, Miami, fl
$30.6M, 119,000sf
• Concrete framed shopping mall renovation with steel office building addition and 3-story parking underneath mall structure
• Performed as cost engineer assisting with owner/design changes
Players Club Apartments - Tallahassee, fl
$30.6M garden style apartment complex
• 7 buildings, 10 acre site
• (2) 5-story apartment buildings
• (4) 3-story townhome buildings
• 217,000sf, 592 beds, 168 units total
• Wood frame construction, garden style, brick and wood siding skin
• Performed as superintendent over the townhome buildings & oversaw their completion
• Brought onto the project when it was 2 months behind; finished on schedule and earned a repeat client
Georgia Highlands College Student Academic Center - Cartersville, GA
$16.8M, 56,000
• 3-story academic building
• Steel structure, brick, storefront, & curtainwall skin, modified bitumen roof (hot applied)
• Assisted with field quality control, change management, monthly billing, document control, and trained younger PE
• Lead the coordination of the 3rd floor labs which included heavy MEP components for fume hoods and lab tables
• Used engineering and construction knowledge to assist in the detailing of various structural sections while offering design input to improve
constructability
Gwinnett County Department of Human Services Office Building - lawrenceville, GA
$25M, 100,000sf office building with connected adjacent 3-level parking garage
• Steel structure, precast concrete skin, curtain wall & storefront, precast parking deck
• Handled all document control and assisted the superintendent in field management
• Worked closely with framing contractor to coordinate wall placement and ceiling construction after MEP coordination
• Managed the installation of door frames, doors, & door hardware throughout
• Directed the installation of millwork including custom wood panel walls in the courtroom and custom service station desks
• Assisted the end user with the coordination of furniture and helped resolve compatibility issues with structured cabling and fixed furniture
• Managed closeout process
MDC Canterfield independent living - Cumming, GA
• $35M senior independent living apartment building
• Concrete structure, PT slab over single level of parking, wood siding & granite skin
• Took the lead on the punch process through completion
estimating/Precon
• Put together bid packages for projects under pursuit
• Won GA Tech East Campus Dining Hall and Avondale Station Mixed Use Development