Page 194 - TRG AIA-305 Prequalification Statement
P. 194

Carl SChwartz



     The                                                                                                 PrinciPal
     RINALDI
     G  R  O  U  P


     arEaS OF EXPErtISE
     Team Building & leadership          Quality control
     Permitting & Building code adherence    Safety and compliance Management
     construction Planning & Scheduling     Vendor and Materials Management
     critical Path Project Management      Estimating and Job costing
     Budget analysis                     Pre-construction Services
     Mechanical & Electrical Engineering      Value Engineering
     Engineering Evaluations             cash Flow requirements and analysis
     construction law
     Performing Building Evaluations and cost analysis for acquisitions

     PrOJECt MaNaGEMENt
     1 . 100% on-time project completion, while Meeting strict timelines and budget requirements.
     2. reviewing and analyzing project bids as well as the critiquing of subcontractor proposals.
     3. reducing project costs by negotiating carefully with subcontractors, and Establishing quantitative
     comparisons of each trade.
     4. contracting, Scheduling and Supervising subcontractors and Enforcing company policies, procedures
     and project safety regulations.
     5. Possessing special expertise in the engineering disciplines allowing for the proper critiquing of all facets
     of this sector in order to ensure project compliance.
     6. Preparing a critical path schedule, and implementing the necessary trades with the manpower necessary
     to accomplish the project goals.
     7. Meeting with banks or lending institutions on a monthly basis to prepare requisitions for projects.
     8. Preparing contract Documents for subcontractors and vendors.
     9. reviewing and analyzing loan documents between developer and lending institution.

     ClIENt aND VENDOr rElatIONS
     increased revenue by direct project control and schedule compliance. Scheduled client meetings, conducted need assessment, explained design concerns
     and cost effective options, planned, estimated and managed the projects from start to completion. negotiated cost estimates with clients, maintained daily
     contact with clients at location sites. Secured over 200 million dollars in new business annually. Developed and prepared project cost analysis for either
     acquisition or construction financing.



     StaFF DEVElOPMENt

     Developed strong employee and subcontractor productivity and possesses the ability to identify, isolate
     and eliminate work hazards. increased productivity by allowing workers to provide input into the work
     process, including scheduling responsibilities, job completion, and using experience to complete tasks.
     reduced turnover, by gaining trust and respect from employees through demonstrating an optimistic
     attitude, resolving problems immediately and establishing open communications. Established a positive
     and productive work environment, by understanding the roles and needs of all team members.


     PrOFESSIONal EXPErIENCE


     design construct international (dci), NY, NY
     Principal
     responsibilities include but are not limited to the review of sites prior to an acquisition, preliminary
     construction budgets, development of trade scopes of work, quantity takeoffs , critical path scheduling,
     site review of construction activities, change order review, and conducting meetingson behalf of the bank
     and lending institutions.


                                                                                                      RINALDINYC.COM
     Page 2                           GATEWAY PLAZA ONE HARMON MEADOW BLVD 1ST FLOOR • SECAUCUS NEW JERSEY 07094 • 201 601 4065
   189   190   191   192   193   194   195   196   197   198   199