Page 220 - TRG AIA-305 Prequalification Statement
P. 220
DonalD BroDerick
The Project executive
RINALDI
G R O U P
180 nassau Street - Brooklyn, nY.
Location consists of over 185’ of frontage on the southwest corner of Nassau and Duffield Streets in Downtown Brooklyn. Building consists of 108,501
SF of residential space, common area and roof deck and viewing lounges. the common area space is highlighted by a “reclaimed warehouse” coffee tech
lounge, an “industrial” library and an urban farming roof deck with a 50’ illuminated reflecting pool, dining area, barbecue grill and cedar planters for
gardening. the gym is fully equipped with new modern state of the art equipment, exposed brick side walls, floor-to-ceiling mirrored walls and resilient
sports flooring. conveniently adjacent to the gym is a 2-level parking garage and bike room. the units consist of wide-board oak floors, rift-cut oak kitchen
cabinets, quartz countertops and stainless-steel appliances including a Delta pull-down faucet, a Whirlpool dishwasher and an LG & Avanti gas range.
Bathrooms consist of floor-to-ceiling ceramic tile, quartz countertops and jaco & Sigma fixtures. the building consists of 103 rental apartments and 35
parking spaces. Of the 103 apartments, the unit mix is 21 Studios, 46 1-BR, 19 2-BR, 1 3-BR, and 16 1-BR+Office. VALUE $24,976,698 ∙ SIZE 10 –
Stories plus Cellar 124 – Market Rate Rental Units 108,501 GSF ∙ ARCHITECT Karl Fischer Architect ∙ STRUCTURAL ENGINEER WSP Cator Seinuk ∙ MEPS
ENGINEER Ettinger Engineering ∙ GEOTECHNICAL ENGINEER RA Consultants ∙ OWNER / DEVELOPER Pink Stone Capital, Empire Mngt
Project Manager
George a. Fuller company, inc., (GaFco) - Val Halla, nY
The residence at ritz carlton, renaissance Square - 221 Main Street, White Plains, nY.
Mr. Broderick joined George A. Fuller (GAFco) in 2006 as a Project Manager for tower A, under the project leadership of Anthony rinaldi and the rinaldi
Group team. responsibilities included, all aspects of project management from labor and trade scheduling to MePS & Architectural coordination to
buyer-seller coordination on base-upgrade sales specifications, offerings and purchasing.
under a design-build construction model, GAFco built the tallest and largest high-rise building(s) in Westchester together with the world-renown
architectural firm Costas Kondylis and their assistants Harvey Kaufman, AIA and Frank Nicholson, AIA, for Cappelli Enterprises, Inc. This $500-M project
consisted of two (2) 47-Story luxury condominium towers with 360-luxory units connected by a 10-Story ritz-carlton Hotel, comprising some 1.2-M SF of
construction, more than 800,000 SF of saleable space, 3-restaurants including a BLt & BoH and 155-Guestrooms.
Senior Project Manager
By Design associates, inc., new York, nY
responsible for construction management of high-end residential condominiums projects in chelsea and Greenwich village, as an in-house General
contractor for private owner/Developer. responsibilities included bidding and award of subcontracts, project scheduling, direction of trade subcontractors,
safety, quality control and direct management of all site operations. Projects: Hudson Blue condominiums $ 5.4-M, SoMA condominiums $ 5.6-M
Project Manager, Superintendent
klewin Building company, norwich, cT
responsible for the construction management of commercial, industrial and education projects of varying magnitude. Principal responsibilities included
development of project scope and bidding documents, bidding, evaluation/award contracts, project scheduling, interface with owner and design
professionals, direction of project trade contractors, safety, quality control and direct management of site supervisory personnel. Projects: trumbull on the
Park, LLc, trumbull center Parking Garage & residential Development $ 27.5-M, city of Norwalk Maritime Parking Garage & retail /residential Development
$ 13.5-M, Fairfield college Preparatory School, Berchmans Hall renovations & Additions $ 8.5-M, city of Bridgeport, Arena at Harbor Yard $ 52-M.
Project Manager
Gilbane Building company, Glastonbury, cT
responsible for the construction management of pharmaceutical and educational projects. Principal responsibilities included development of project scope
and bid documents, bidding, evaluation/award contracts, project scheduling, interface with owner and design professionals, direction of project trade
contractors, safety, quality control and direct management of site supervisory personnel. Projects: Fairfield university, thomas Walsh Athletic center $5.0-
M, town of Westport, Green’s Farms elementary School $ 16-M, Pfizer, inc, Plant restructuring Program $ 120-M.
Project Manager
The e & F construction company, Fairfield, cT
responsible for fast track construction management projects for educational and commercial clients. Principally responsible for program and project
management of high tech / architectural renovations of existing owner facilities with short schedule duration. Project: clairol, inc, corporate Headquarters
relocation $ 5-M, Fairfield university, New Locker room Facility $ 3-M, Hartford realty Associates, 55 Farmington Avenue office complex $48-M,
richardson-vicks, inc, New office Addition $ 14-M, ridgebury office Associates, ridgebury office center $ 9-M, Boehringer ingelheim Pharmaceuticals,
Production Facility & Lab expansion $ 15-M.
RINALDINYC.COM
Page 2 GATEWAY PLAZA ONE HARMON MEADOW BLVD 1ST FLOOR • SECAUCUS NEW JERSEY 07094 • 201 601 4065