James Fleming


                                                                               General Superintendent





     PROFessiOnal eXPeRienCe

     The Rinaldi group of Florida, llC – miami, Fl
     senior Project engineering
     1177 Kane Concourse . Bay Harbor – miami
     new ground-up 8-Story mixed-use development grossing 472,000 SF and comprising of 54-Condominium
     units totaling 156,000 SF, Office Space totaling 118,00 SF with 514-parking Spaces across a 198,000 SF
     of parking Garage structure.  architect – arquitectonica, Civil engineer – Kimley Horn, Structural engineer –
     MCe, MepS engineer – exp., traffic-parking – david plummer & associates, interior designer – Md.

     Yates Construction
     general superintendent
     united State embassy, Kuala lumpur, indonesia
     evaluation, survey for constructability and preconstruction for new and existing buildings.

     2Kings Casino pre-launch phase #3
     preconstruction and construction of phase #3 adding additional gaming units to existing temporary casino.
                                                                                                   [email protected]
     2Kings Casino Opportunity 1-- Kings Mountain n.C. $ 450 M project
     preconstruction for a 200000 ft2 casino with a 3000 car parking garage, 24 story guest tower.

     dual Brand Hotel –1Hotel, nashville, tn
     Brought in to assure schedule recovery on an 18 story hotel that shared a 4 story podium with the embassy Suites Hotel.

     Plaza Construction
     senior superintendent/ meP superintendent
     arlo Hotel Miami
     Ground up new pt/curtain wall 10 story boutique hotel in Wynwood, Florida topped off project 100 days ahead of schedule.
     Sanctuary Condominiums tampa
     Brought back to plaza to get project back on track and achieve tCO.

     Westland Mall-Hialeah, Fla-2 phase $38 M project
     preconstruction, demolition and new construction on (14) new stores/restaurants in the Mall. Job shut down due to Corona Virus in april
     2020---Furloughed by plaza.
     ritz Carlton 1 lincoln rd. South Beach, Miami $175M project
     total renovation to an 11 story main tower and two 35 unit lanai style suite hotels with 375 guest rooms.
     Supervised all trades for upgraded Mep and interior fit out.

     parisio Bay and Gran parisio $156M and $165M projects
     • responsible for top 4 floors on both buildings to achieve tCO
     • 3rd party inspections and fire department testing/ close out

     ritz Carlton residences---$170M project
     • Constructability review and design options for a/e team
     • Construction of 100 high end condos in 6 buildings
     Biscayne Beach Condos---$155M project
     Senior Superintendent/Mep Superintendent and interior Superintendent
     • Supervised all interior/Mep trades building a 55 story high rise 399 unit leed Silver complex.
     • assisted a/e team with a multitude of issues to achieve constructability.
     •Coordinated all inspections. Zero failed inspections and a letter from MtCi when job was complete.