Page 255 - TRG AIA-305 Prequalification Statement
P. 255
James Fleming
General Superintendent
Borgata Casino Hotel, north expansion, atlantic City, n.J.
General Superintendent for MurMur night Club $20M
please see WWW.theborgata.com
Mep Superintendent for restaurants and kitchens $30M
• delivered project three months ahead of schedule
• installed, punched down and tested 27 miles of MC cable and 22 miles of cat 6 and fiber for features in MurMur nightclub. launch customer for 10000
color lights.
• MurMur had a standalone 1200 sq. ft. data center
• all stone and millwork
• assisted with the Mep work in a 10-tennant-food court and resolved design issues in Bobby Flay and Wolfgang puck designed kitchens.
essex County Correctional Facility Combined Heating and Cooling plant, newark, n.J.--$20M project
Mep Onsite Manager, Start up and Commissioning Manager
• designed and installed owner supplied control system
• Conducted start up for a natural gas/fuel oil plant
• provided as-built drawings
• directed all trades on a 7Mw combined cycle plant
Monmouth park race track, total HVaC replacement project
$35M project
please see www.monmouthpark.com
• resolved operational and construction issues regarding atC controls and design for three 400-ton absorber/chillers.
• Wrote sequence of operation for atC
projects providing expert troubleshooting
• State of new Jersey Monmouth Battlefield---Corrected geothermal and ddC control systems.
• east Windsor High School----Corrected geothermal problems
• Bear tavern elementary School ----redesigned ddC components for heat pump system.
• Galloway township Middle School---Corrected GC mistakes that were impeding HVaC system control.
• indian Hill Middle School---resolved issues with HVaC system that were health department concerns.
• Commercial township elementary School--- executed repairs to HVaC system to allow proper operation of the VFd system.
K-12 School projects
experience on over 76 K-12 School projects in nY, nJ, pa., Ct. and de. each school had a tier 2 or 3 data center reporting to central office hub. i have
served in many different capacities ranging from Mep Superintendent to General Superintendent.
Municipal projects
• atlantic County energy retrofit- project Manager/Construction administrator for the Mep refit of 37 buildings. ($26 million) • Cape May County energy
retrofit--project Manager/Construction administrator for the Mep refit of 32 buildings. ($22 million)
Health Care projects
• Cooper university Medical Center--new chillers and cooling towers ($4Million)
• n. J. School of dentistry and Medicine--total redesign and installation of all medical gas piping. ($600,000)
• Meadowview nursing Home--total renovation. ($3 Million)
• Methodist Homes of new Jersey--HVaC replacement in 5 assisted living centers. ( $7Million)
marlee Contractors
service manager
i was the Service Manager for a local mechanical and electrical contractor. Contracts included over 100 WaWa stores, several school districts in new Jersey;
many local municipalities and private industries. daily responsibilities include staffing, logistics, inventory, sales and marketing, customer interfacing, vendor
interfacing, expert troubleshooting, engineering design review, site surveys, training directors of Facilities on new equipment and engineering methods for
proper energy management
RinalDiFl.COm
page 3 12000 BiSCaYne BlVd - Suite 409 - MiaMi Fl, 33181 • 305 709 3000 OFFiCe • 305 709 4000 FaX