Dominic Scavone
Project SuPerintendent
• Proposed reshoring redesign which allowed cMu construction to commence roughly one month early per floor, adding to the overall schedule
enhancement.
aqualea Resort ($111m) - clearwater Beach, FL
• resort consisted of 17 stories, 764 parking stalls, 2 swimming pools, 906,000 SF, 250 hotel units, beachfront co- tel, mixed use retail, placed upon
drilled shaft foundations.
• directed project from preconstruction phase to completion
• Worked directly with developer/ General contractor to enhance construction schedule and labor efficiency. directed staff consisting of Superintendents,
Project Managers, and field engineers.
• Authored and drove look ahead schedule, overall Project schedule, provided overall project sequencing and management of project goals and timelines.
• eliminated several design and engineering issues during preconstruction phase to eliminate unnecessary foundations. re-designed foundation reinforcing
to enhance and promote efficiency and expedite schedule by several weeks.
• combined both conventional framing and “flying tables” in areas of repetition to reduce overall manpower and timeline. overall cost savings on elevated
floors $2.2M.
• created site laydown, hoisting, site logistical plan for all subtrades within a zero-lot line beachfront property all while maintaining traffic flow.
oPUS construction - Tampa, FL
General Superintendent
Water’s edge ($126M)
• Hands-on oversight of 544,000SF (32) tunnel form in place tower, (4) level parking structure, (4) level 210 units of multi-family.
• Provided preconstruction logistical site plan, construction sequencing, material estimating and buyout. Supervision of all project divisions. directed weekly
subcontractor meetings, worked with the project management team on overall construction schedule and general condition cost forecasts.
• captured $5.2 million in cost savings through effective schedule sequencing thru cutting 220 weeks from overall construction schedule.
• directed team and created cost management within the General conditions model that reduced manpower and overhead which led to a $1.1M labor
savings.
HaRDin conSTRUcTion - Tampa, FL
Superintendent
one HArBor iSLAnd ($86M)
• 24 level residential tower sitting on drilled shaft foundations with 414,000SF cast in place post tension construction. 6 level parking structure and 4
adjacent multi family structures. Provided daily management, scheduling and coordination of all subtrades. Procurement and management of all structural
commodities due to direct material purchase contract.
• cost savings of $6M due to V/e items during preconstruction phase. Worked with Architect and engineer to revise components to reduce costs. Authored
and submitted all design changes to ownership.
• Successfully completed project 11 weeks ahead of original construction schedule.
Peabody construction - Braintree, mass
Superintendent
Mission Main - roxbury, MA
• construction of a 535-unit multi-family project. 12 cast in place post tension structures with cMu masonry veneer.
• overall daily supervision of all subtrades, weekly scheduling and subcontractor meetings.
• Assisted Project Management team with monthly Pay Applications and cost forecasting.
The nautica - Boston, ma
• construction of 117 unit Multi- family project. Several cost in place residences for Hud
• Managed day to day construction activities of all trade partners
• Maintained construction schedule and provided updates to the project management group.
Scavone concReTe conTRacToRS – new York, nY
Field engineer, carpenter & cement mason
Seasonal employee for family-owned structure contractor. job duties including everything from layout, elevations, assemble concrete tables, formwork for
vertical elements, place, and finish flatwork.
RINALDIFL.COM
Page 2 1444 BISCAYNE BLVD - SUITE 305 - MIAMI FL, 33132 • 305 709 3000 OFFICE • 305 709 4000 FAX