Page 256 - TRG AIA-305 Prequalification Statement
P. 256

James Fleming


                                                                               General Superintendent





     Concord engineering group
     Construction administrator/Commissioning manager
     i provided onsite construction administration and Mep management. this included answering rFi’s and negotiated change orders for over 75 K-12 schools;
     was the Start up Manager at a 7Mw co-gen plant; and assisted in the design of several projects. CeG would sub contract me out as an Mep/ddC controls
     expert and have me train directors of Facilities on proper BMS and physical plant operation.

     Bally’s Park Place Casino Hotel
     Facilities shift manager
     i directed the daily operation of 3.8-million-square-foot, four-star complex with 1,300 rooms, 70,000-square-foot casino and 20,000-square-foot
     convention area. i commissioned an 800-room hotel tower, new transportation center, new parking garage and casino. My duties included: project
     management, monthly p&l statements, securing outside vendors, department training (OSHa 1910 CFr), ongoing hotel room and commercial kitchen
     rehabilitation projects.

     Claridge Casino Hotel
     Facilities shift supervisor
     My duties there included the overall daily operation of a 500-room, three-star hotel with a 40,000-square-foot casino. . Work included supervision of
     tradesmen doing structural and equipment repairs in accordance with nJ health codes.

     Tropicana Casino Hotel
     Tivoli Pier lead mechanic
     i was the lead mechanic that was responsible for the daily routine of 13 mechanics at a four-star hotel. duties included the commissioning of the plumbing,
     air conditioning, refrigeration, hydraulics, robotics and fiber optics in tivoli pier.
     Claridge Casino Hotel
     HVaC Technician/Plumber
     Journeyman mechanic and duties included preventive and corrective maintenance to a 500-room casino hotel complex. Work included project support
     for new construction and repairs to Halon, Simplex and ansul fire system; installation and operation of Barber-Coleman HVaC (BMS) computer system,
     plumbing and grease recovery operation. installation and operation of new city water check valves for various potable to heating/chilled water applications.

     U.s navy-- Uss Henry Clay ssBn 625
     submarine auxiliaryman
     i stood top watch station as Machinery room #1 Supervisor and was responsible for plumbing and potable water, atmosphere control, hydraulics,
     pneumatics, HVaC and refrigeration. i was command advanced from petty Officer 3rd Class to 2nd Class, qualified for submarines on 1st patrol and received
     letters of Commendation and letters of appreciation from the Commanding Officer and SuBGrOup 6 Squadron admiral.

     CeRTiFiCaTiOns
     leed 2.0 accredited professional - Bd+C
     CCt Certified Cost technician
     OSHa 30hr Construction Safety






















                                                                                                       RinalDiFl.COm
     page 4                                12000 BiSCaYne BlVd - Suite 409 - MiaMi Fl, 33181 • 305 709 3000 OFFiCe • 305 709 4000 FaX
   251   252   253   254   255   256   257   258   259   260   261