Michael izzo



     The                                                                       General Superintendent
     RINALDI
     G  R  O  U  P



     PRoFeSSioNal eXPeRieNce
     The Rinaldi Group – Secaucus, NJ
     Project Superintendent
     Residences at Mandarin oriental
     685 Fifth avenue New York, NY
     located in Manhattan’s plaza district neighborhood, this existing 20-Story property located at 685 Fifth
     avenue was built in 1926 on the block encompassing “the world’s most expensive real estate” and the
     country’s highest retail on average annually at $3,000/SF in 2017, as referenced by the new York times.
     this most prestigious corner property located on 54th Street & Fifth avenue between Central park and
     rockefeller Center will undergo a significant upgrade structurally removing the existing roof structure and
     adding 10-Stories to this historical residential building. this monumental undertaking will add roughly
     20,000 SF of residential space expanding the existing 20-Stories totaling 115,000 SF of building to newly
     constructed 30-Stories totaling some 135,000 SF, while converting what was once 148-residential units
     into 69-ultra-luxurious condominium residences. While maintaining such exclusive retail tenants such as
     taG Heuer and COaCH, the residences at Mandarin Oriental create a most exquisite lifestyle experience
     bringing together the palatial amenities and opulent services of the legendary Mandarin Oriental with the
     elegance and ambience of a private home setting.  Having just recently achieved the 1st milestone of tCO   [email protected]
     for Floors 9, 10 & 11 in February 2023, it should be noted that buyers are purchasing units at $6,000+/SF.
     Value $90,187,872 – SiZe 30 Stories, 69 units 135,000 SF – arCHiteCt Marin architects – StruCtural
     enGineer deSimone - interior design March & White - MepS enGineer lilker associates Mechanical and
     electrical engineers – deVelOper Michael SHVO.

     2420 amsterdam avenue - New York, NY
     a new 24-story ground-up mixed use Office & Hospitality development in the Washing Heights section on new York City. the gross square footage is
     approximately 287,000 GSF across two connecting towers. at over 260 feet in height this will be one of the tallest buildings in the neighborhood. amenities
     will include underground parking, event space with outdoor terraces, and ground-floor restaurant and retail. Value $87,361,278 - SiZe 24-Story 286,999
     SF 221 Key - arCHiteCt Stonehill & taylor - Mep engineer Cosentini associates - Structural engineer Gace Consulting engineers - OWner Youngwoo &
     associates

     Pizzarotti llc – New York, NY
     General Superintendent
     anbau – 39-41 West 23rd Street
     double tower with a 25 Story concrete superstructure on 23rd street & a 12 Story
     concrete superstructure on 24th street, 120,000SF, 48 unit Condominium Building built
     for anbau enterprises:
     • General superintendent responsible for all aspects of construction.
     • responsible for the completion of foundation to ground up construction and the coordination of sequencing and starting concrete superstructure which
     split into two separate towers after the ground floor.
     • engaged with the field coordination of all concrete embeds. Held pre-pour meetings and ensured up to date information was available for all
     subcontractors. resolved any in field coordination issues to ensure concrete superstructure was not delayed.
     • Worked directly with the structural engineer deSimone and the formwork engineering team at eFCO to ensure that the 12’ cantilevered slab on the 15th
     floor was properly constructed, shored, stripped and monitored.
     • directed and supervised the installation of all MepS trades following superstructure.
     • Coordinated with the design team and the all subcontractors the means and methods for installations of the complex façade system designed by Cookfox
     which includes a make up of limestone, terra-cotta, metal panels, built in landscaping planter, decorative metal railings, and an aZa window system which
     included large lift and slid, fixed and operable windows with limited access for installations.
     • responsible for the coordination and starting of rough carpentry. reviewed with the design team and subcontractor the intricate layouts which included
     single floor and duplex accommodations. Held weekly meetings with the design team to review layouts and resolve any field issues.
     • developed on a weekly basis real time field look ahead schedules that were reviewed with the subcontractors, owners, and project team.
     • tasked with the development and maintenance of the site logistics plan. Worked directly with the site safety team and expeditors to ensure that the site
     logistics plan was updated throughout all phases of construction and in compliance with all laws & codes.
     • Held weekly on-site safety and progress meeting with subcontractors. Created project specific meeting minutes that addressed safety issues reviewed
     project progress and addressed any issues in the field.