Page 239 - TRG AIA-305 Prequalification Statement
P. 239

RobeRt LawLeR


                                                                               General Superintendent






     PRoFeSSIoNaL eXPeRIeNCe

     the Rinaldi Group of Florida, LLC – Miami, FL
     General Superintendent

     Flagler Station, west Palm beach, FL
     General Superintendent
     Ground up construction of an 8-Story, 162,000 SF rental apartment building with 3rd floor pool deck,
     fitness center, ground floor retail and amenity spaces in downtown West palm Beach. this is a high profile
     affordable housing project for the City of West palm Beach with involvement from the Mayor’s office and
     funding provided by Florida Housing Finance Corporation (FHFC) and the Community redevelopment agency
     (Cra) of West palm Beach. the project also includes a public linear park utilizing historic railroad cab and
     tracks with modern hardscape and landscape. Value: $22,400,000 – SiZe: 8-Stories, 162,000 SF, 94 units
     - arCHiteCt: Corwil architects – StruCtural enGineer: Mcnamara Salvia - Mep enGineerS: rpJ. CiVil
     enGineer: WGi.

     warren Henry auto Group, North Miami, FL                                                   [email protected]
     General Superintendent
     this facility is a state-of-the-art $80 million, 8 Stories, 750,000 SF auto dealership / headquarters for the
     Warren Henry auto Group in north Miami, the largest auto dealership facility in South Florida. this was a distressed project where trG was called in at
     40% completion to replace the terminated GC and “right the ship” to achieve tCO and CO. We provided a full Construction Management team including
     project executive, General Superintendent, Superintendent, HVaC Superintendent and electrical Superintendent. through our expertise and direction, the
     project was put back on track by providing the required leadership as we worked with trade contractors to ramp up their crew sizes and bring in competent
     foremen.  We achieved tCO ahead of our schedule goals after being 12 months behind schedule with the former GC. there were numerous items of non-
     conforming work that were identified by trG and corrective work was undertaken after consultation with the architect, engineers and third party inspectors.
     Value: $80,000,000 – SiZe: 8-Stories, 750,000 SF - arCHiteCt: rVl architecture and design.
     the Raleigh Hotel, Miami beach, FL
     General Superintendent
     the project consists of the restoration and conversion of the historic 9 Floor Hotel into a modern 5-Star luxury hotel and the construction of a new
     beach-side pavilion Building with a 11,000 SF basement and 8 new townhouses above. Major structural repairs were required including concrete
     restoration and repairs to aging terra cotta block that provided the structure for the grand lobby ceiling. a new steel bridge was constructed to provide
     access from the north side of the property over the 11,000 SF pit that had been excavated and waterproof for the basement of the pavilion structure. a
     $1,500,000 temporary tropical garden was constructed on the east side of the property adjacent to the beach for a promotional sculpture garden with
     over $10,000,000 of art curated throughout the garden. Value: $50,000,000 – SiZe: 9-Stories, 102,000 SF – arCHiteCt: Kobi Karp architecture -
     StruCtural enGineer: YHCe - MepS enGineerS: Ventrop engineering - CiVil enGineer – Ocean engineering.

     the Rinaldi Group - Secaucus, NJ
     215 Pearl Street – New York, NY
     General Superintendent and Senior Project Manager
     new ground-up 39-Story Hotel spanning 165,655 SF with Cellar with 2nd Floor amenities including a Gym, Bistro restaurant, Bar lounge & Café with
     Business Center, Board/Meeting room, Media pods, Home theater and Community Seating and 3rd Floor amenities including a Full-Service Kitchen,
     Fireplace, Hearth room, Coffee niche, dining, lounge, Outdoor terrace, Study and Media lounge. Overall hotel stands 443’-high and consists of
     320-Guestrooms across two different Marriott brands with the residence inn occupying the upper floors and 120-Guestrooms and Courtyard occupying
     the lower floors and 200-Guestrooms. Construction cost $55,375,000. architect – nobutaka ashihara architects; Geotechnical engineer – ra Consultants;
     Structural engineer – WSp Cantor Seinuk; MepS engineer – edwards & Zuck; elevator Consultant – Jenkins & Huntington; interior designer – MBid &
     partners.