Michael izzo



     The                                                                        Project SuPerintendent
     RINALDI
     G  R  O  U  P



     PRoFeSSioNal eXPeRieNce
     The Rinaldi Group – Secaucus, NJ
     Project Superintendent
     2420 amsterdam avenue - New York, NY
     A new 24-story ground-up mixed use office & Hospitality development in the Washing Heights section on new
     York city. the gross square footage is approximately 287,000 GSF across two connecting towers. At over 260
     feet in height this will be one of the tallest buildings in the neighborhood. Amenities will include underground
     parking, event space with outdoor terraces, and ground-floor restaurant and retail. VALue $87,361,278
     - SiZe 24-Story 286,999 SF 221 Key - ArcHitect Stonehill & taylor - MeP engineer cosentini Associates -
     Structural engineer Gace consulting engineers - oWner Youngwoo & Associates

     Pizzarotti llc – New York, NY
     General Superintendent
     anbau – 39-41 West 23rd Street
     double tower with a 25 Story concrete superstructure on 23rd street & a 12 Story
     concrete superstructure on 24th street, 120,000SF, 48 unit condominium Building built
     for Anbau enterprises:
     • General superintendent responsible for all aspects of construction.                         [email protected]
     • responsible for the completion of foundation to ground up construction and the coordination of sequencing
     and starting concrete superstructure which split into two separate towers after the ground floor.
     • engaged with the field coordination of all concrete embeds. Held pre-pour meetings and ensured up to date information was available for all
     subcontractors. resolved any in field coordination issues to ensure concrete superstructure was not delayed.
     • Worked directly with the structural engineer deSimone and the formwork engineering team at eFco to ensure that the 12’ cantilevered slab on the 15th
     floor was properly constructed, shored, stripped and monitored.
     • directed and supervised the installation of all MePS trades following superstructure.
     • coordinated with the design team and the all subcontractors the means and methods for installations of the complex façade system designed by cookfox
     which includes a make up of Limestone, terra-cotta, metal panels, built in landscaping planter, decorative metal railings, and an AZA window system which
     included large lift and slid, fixed and operable windows with limited access for installations.
     • responsible for the coordination and starting of rough carpentry. reviewed with the design team and subcontractor the intricate layouts which included
     single floor and duplex accommodations. Held weekly meetings with the design team to review layouts and resolve any field issues.
     • developed on a weekly basis real time field look ahead schedules that were reviewed with the subcontractors, owners, and project team.
     • tasked with the development and maintenance of the site logistics plan. Worked directly with the site safety team and expeditors to ensure that the site
     logistics plan was updated throughout all phases of construction and in compliance with all laws & codes.
     • Held weekly on-site safety and progress meeting with subcontractors. created project specific meeting minutes that addressed safety issues reviewed
     project progress and addressed any issues in the field.
     • Was present for all monthly requisition inspections with lenders. issued monthly tracking matrix’s showing progress on the site each month, created and
     issued activity or trade specific look ahead schedules as required.

     Marriott ac hotel – 151 Maiden lane
     34 Stories, 140,000SF, 274 unit Hotel with a ground floor retail space for commercial use built for the Lcre Group:
     • General superintendent responsible for all aspects of construction from superstructure to opening.
     • responsible for the completion of the 34 story concrete superstructure designed by Gace.
     • responsible for overseeing the installation of all MePS and Fire alarm rough in, testing, and sign offs.
     • oversee and direct all carpentry work from rough carpentry to finish drywall.
     • responsible for the coordination, and installation of the hybrid window wall system designed by Kingstar. Present for all inspections and on site testing of
     the façade system completed by Frank Seta Associates and ensure sign off of the facade system.
     • responsible for overseeing and coordinating the installation of all site work which included sidewalks on Maiden lane, Front Street and Fletcher Street.
     Work was coordinated with the installation of a Presray flood barrier system. ensured proper
     installations and sign off of flood barrier system.
     • Lead a team of superintendents through the finishing stages of the project and put a project specific quality control program in place to ensure an
     acceptable level of finish was established and Marriott standards were met for this project.
     • Worked directly with Peter Poon Associates to resolve all field issues and capture all design changes throughout the length of the project.